PHASE-II Grid connected Solar rooftop programme 

PHASE-II Grid connected Solar rooftop programme

The Cabinet Committee on Economic Affairs (CCEA) has approved the Phase-2 of Grid Connected Roof top Solar programme for achieving cumulative capacity of 40 GW from Roof top Solar (RTS) projects by 2022 through a total Central Financial support of Rs.11,814 Cr. This scheme is proposed to be implemented through the Electricity Distribution Companies (DISCOMs).

The brief of different components/ incentives are as follows:

Component A : Central Financial Assistance (CFA) to residential sector – 4GW:
  • CFA at 20% for capacity beyond 3 kWp and upto 10 kWp
  • CFA at 20% for Group Housing Societies (GHS)/Residential Welfare Associations (RWA) capacity upto 500 kWp (limited to 10 kWp per house and total upto 500 kWp).
  • Domestic manufactured modules and Solar cells to be used.
  • CFA shall be on benchmark cost of MNRE for the State/UT or lowest of the cost discovered in the tenders for that State/UT in that year, whichever is lower.

  • Component B: Incentives to DISCOMs – for initial 18 GW Capacity:
  • Progressive incentive for DISCOMs for achievements above baseline (the cumulative RTS capacity installed at the end of previous financial year).
  • No incentives for capacity addition up to 10%
  • 5% incentives for addition beyond 10% and upto 15%
  • 10% incentives for addition beyond 15%
  • Solar Guidelines