• For Power Failure Complaints
  • 9498794987
  • 24 x 7

๐Ÿ“‘ Board Proceedings Details


1. Proceedings Number: 49
2. Proceedings Date: 08-05-2026
3. Organization Type: TANTRANSCO
4. Branch: Technical
5. Type (Permanent/Routine): Permanent
6. Type (Chairman/Full Board/Managing Director): Chairman
7. Subject: TANTRANSCO โ€“ Replacement of failed 1No. 16 MVA, 110/33 kV Power Transformer I by a healthy one and ratification for having replaced the same at Manapparai 110/33-11 kV SS in Trichy Operation Circle (Trichy Metro EDC) of Trichy Region โ€“ Administrative approval โ€“ Accorded.
8. Reference: Chairman's approval dated : 15.04.2026
9. Remarks: TANTRANSCO โ€“ Replacement of failed 1No. 16 MVA, 110/33 kV Power Transformer I by a healthy one and ratification for having replaced the same at Manapparai 110/33-11 kV SS in Trichy Operation Circle (Trichy Metro EDC) of Trichy Region โ€“ Administrative approval โ€“ Accorded.
10. Body:

TANTRANSCO โ€“ Replacement of failed 1No. 16 MVA, 110/33 kV Power Transformer I by a healthy one and ratification for having replaced the same at Manapparai 110/33-11 kV SS in Trichy Operation Circle (Trichy Metro EDC) of Trichy Region โ€“ Administrative approval โ€“ Accorded.