6. Type (Chairman/Full Board/Managing Director):Managing Director
7. Subject:Electricity – Trichy Region – Pudukottai EDC – Power evacuation of 4.8 MW from waste heat recovery based Co-gen power plant of 6MW capacity of M/s. Sabari Industies Pvt. Ltd., by erecting a separate 11 kV feeder with Dog conductor from the plant to the existing T.Nallur 110/33-11 kV SS by the Generator – Administrative approval– Accorded.
8. Reference:Chairman cum Managing Director’s approval dated 21.01.2026