• For Power Failure Complaints
  • 9498794987
  • 24 x 7

đź“‘ Board Proceedings Details


1. Proceedings Number: 198
2. Proceedings Date: 11-11-2025
3. Organization Type: TANTRANSCO
4. Branch: Technical
5. Type (Permanent/Routine): Permanent
6. Type (Chairman/Full Board/Managing Director): Chairman
7. Subject: Replacement of existing failed 1No.16 MVA, 110/11 kV Power Transformer I by a healthy one and ratification for having replaced the same at Mangalamedu 110/33-22-11 kV SS in Trichy Operation Circle (Perambalur EDC) of Trichy Region – Administrative approval – Accorded
8. Reference: Chairman’s approval dated 02.11.2025
9. Remarks: Replacement of existing failed 1No.16 MVA, 110/11 kV Power Transformer I by a healthy one and ratification for having replaced the same at Mangalamedu 110/33-22-11 kV SS in Trichy Operation Circle (Perambalur EDC) of Trichy Region – Administrative approval – Accorded
10. Body:

Replacement of existing failed 1No.16 MVA, 110/11 kV Power Transformer I by a healthy one and ratification for having replaced the same at Mangalamedu 110/33-22-11 kV SS in Trichy Operation Circle (Perambalur EDC) of Trichy Region – Administrative approval – Accorded